What’s called a “glare” study required by the FAA has utility Evergy calling off plans for a large solar array at Kansas City’s new airport.
The Energy News Network reported Evergy had plans to put the 5-megawatt project atop a six-story parking garage but in November, backed off the idea.
Click here for the story from the Energy News Network.