Opponents of a proposed wind farm near Arcadia are disseminating a study about the proposal.
The study, launched in 2017 by the Southwest Power Pool grid and not conducted until 2023 determined the connections necessary to provide electrical power would cost $13.5 million.
Click here for News 9