Cheniere Energy LNG reached a big milestone by loading its 4,000th LNG shipment at the Sabine Pass operation in Louisiana.
It was loaded onto a ship named the Maran Gas Ithaca.
Cheniere Energy, operator of the Midship pipeline that takes natural gas from Oklahoma’s SCOOP and STACK plays and begins near Kingfisher, calls itself the fastest company ever to hit 4,000 shipments. It began the LNG shipments in 2016.
Click here for Zacks Equity Research