Baker Hughes recorded a drop in earnings from 2Q to 3Q

 

Baker Hughes reported a drop in earnings for the third quarter from the second quarter showing revenue of $6.9 billion, but it was an increase of 4% from a year earlier. However, the quarterly decline totaled 3%.

Its adjusted EBITDA was $1,208 million which was 23% more than the previous year. The firm’s attributable net income totaled $766 million.

“We delivered another quarter of record EBITDA, highlighted by exceptional operational performance across both segments,” said Lorenzo Simonelli, Baker Hughes Chairman and Chief Executive Officer in a release by the company.

“Our margins continue to improve at an accelerated pace, with total company EBITDA margins increasing to 17.5%. This marks the highest margin quarter since the company was formed. On the back of our solid third-quarter results and stable outlook, we remain confident in achieving our full-year EBITDA guidance midpoint.”

“Orders remain at solid levels, with IET orders of $2.9 billion marking the eighth consecutive quarter at or above these levels. IET continued to demonstrate strong order momentum for gas infrastructure and FPSOs, booking the largest ever ICL compressor award from Dubai Petroleum Establishment for the Margham Gas storage facility and two FPSO awards with separate offshore operators.”

Industrial & Energy Technology (“IET”) experienced a strong quarter for its Integrated Compressor Line (“ICL”) technology. In its largest ICL award to-date, and booked under Climate Technology Solutions (“CTS”), Baker Hughes will supply 10 units to Dubai Petroleum Establishment for the Margham Gas storage facility. These ICL units will support gas infrastructure, providing stability to Dubai’s energy supply by strengthening the system’s ability to switch between natural gas and solar power.

IET’s Gas Technology Equipment (“GTE”) was also awarded a significant contract to supply advanced compression solutions to Saipem for TotalEnergies’ all-electric Kaminho Floating Production Storage and Offloading (“FPSO”) project in Angola.

Baker Hughes’ centrifugal BCL compressor and ICL technology were selected because of the capability to minimize greenhouse emissions and eliminate routine flaring by reinjecting associated gas into the reservoir for storage. Separately, IET was selected to provide electric motor-driven process compressors for an FPSO project in Latin America.

IET’s Gas Technology Services (“GTS”) secured a multi-decade agreement for an LNG facility in the Middle East. The scope encompasses extensive maintenance services and digital solutions, leveraging Baker Hughes’ iCenter™ Remote Monitoring and Diagnostics capabilities.